ShippingWatch

Equinor expects increased oil output from Johan Sverdrup

Equinor projects that oil field Johan Sverdrup can produce more oil faster than expected. Expectations for peak levels in both phases one and two have been raised.

Photo: TOM LITTLE/AFP / AFP

Norwegian oil company Equinor expects oil field Johan Sverdrup's first phase to go into the highest gear earlier than expected.

The firm now expects to reach so-called plateau production in early May. The previous expectation was some time during summer.

Already a subscriber? Log in.

Read the whole article

Get access for 14 days for free.
No credit card is needed, and you will not be automatically signed up for a paid subscription after the free trial.

  • Access all locked articles
  • Receive our daily newsletters
  • Access our app
An error has occured. Please try again later.

Get full access for you and your coworkers.

Start a free company trial today

More from ShippingWatch

Blackrock becomes major shareholder in Borr Drilling

Multinational asset manager Blackrock now owns 5.67% of Borr Drilling’s shares. The equity purchase is announced the same day as Borr Drilling sells three rigs under construction to strengthen the company’s strained economy.

One alternative fuel may be particularly dangerous

In a new study – which Maersk, Shell, Euronav and MSC Ship Management, among others, are behind – the new alternative fuels are ranked based on how dangerous they are. The industry has to be careful with one of them, in particular.

Further reading

Related articles

Latest news

See all jobs